一Integrated seamless Terrazzo floor, focusing on seamless two words, then, how to make seamless Terrazzo seamless?
The integrated seamless Terrazzo floor is generally constructed by on-site pouring. If the Terrazzo floor is not designed with patterns, the Terrazzo floor is already integrated when pouring, and only needs to be polished later. If the ground is designed with patterns, it depends on whether there is a dividing strip. If there is a dividing strip, first wait for the Terrazzo ground to be cast as a whole, and the hardness meets the grinding standard. Check carefully to ensure that the dividing strip is firm and there is no gap between the ground.
When adding slurry, it is necessary to clean the base surface first and use specialized cement grinding stone as the filling material. It is important to conduct a comprehensive filling to prevent omissions. If necessary, nano cement and mineral pigments can be used for color matching, as close as possible to the color of the edge pattern of the gap, applied and filled, and then the entire ground is polished to make it a flat whole.
If the dividing strip is not used, when the whole Terrazzo flooring project is completed, it must be carefully checked whether the adjacent two colors are clearly separated and whether there is color mixing.
The integrated seamless Terrazzo floor shall be subject to overall polishing and crystal surface treatment after the overall completion. Make the entire floor bright and level into one.
One seamless Terrazzo is a perfect embodiment of the craftsman spirit behind the high-end, luxury and fashion.
版权所有:深圳市富通源建筑工程有限公司 粤ICP备16114115号 技术支持:启创网络